C2010-555 受験記対策 & C2010-555 全真問題集

 

我々の承諾だけでなく、お客様に最も全面的で最高のサービスを提供します。IBMC2010-555 受験記対策の購入の前にあなたの無料の試しから、購入の後での一年間の無料更新まで我々はあなたのIBMのC2010-555 受験記対策に一番信頼できるヘルプを提供します。IBMのC2010-555 受験記対策に失敗しても、我々はあなたの経済損失を減少するために全額で返金します。

もし弊社のIBMC2010-555 受験記対策について問題集に興味があったら、購入するまえにインターネットで弊社が提供した無料な部分問題集をダウンロードして、君の試験に役に立つかどうかのを自分が判断してください。それにJapanCertは一年の無料な更新のサービスを提供いたします。

C2010-555試験番号:C2010-555 模擬トレーリング
試験科目:「IBM Maximo Asset Management v7.6 Functional Analyst」
最近更新時間:2017-06-28
問題と解答:70

>> C2010-555 模擬トレーリング

 

NO.1 A company has a work order with 50 separate tasks and 40 of the tasks have been completed.
The
company would like the remaining 10 tasks grouped with a new parent work order
Which option will group the tasks?
A. Create a new work order and add the task work orders on the Plans tab
B. Create a new work order and add the child work orders on the Plans tab
C. Select the task work orders and Create Work Package.
D. Select the task work orders Create Job Plan from Work Plan
Answer: C

C2010-555 難易度   

NO.2 A user has created a work order against asset ABC. A technician determines that asset ABC is
faulty and
it needs to be replaced. The technician replaces asset ABC at the operating location with asset XYZ
from
a repair location.
What happens after the swap?
A. inventory locations of the assets have been swapped
B. Asset locations have been swapped.
C. The faulty asset ABC status at the operating location gets updated to OBSOLETE.
D. Asset identifiers have been swapped
Answer: B

C2010-555 予想   C2010-555 英語版   

NO.3 A workflow process has been revised and the new revision made active.
What happens to records that had already been routed into that workflow process before this was
done?
A. They are removed from workflow and are started in the new revision by a cron task.
B. They switch to running in the new revision as that is the only active revision.
C. They continue running in the earlier revision.
D. They are removed from workflow and must be restarted manually.
Answer: A

C2010-555 ガイド   

NO.4 A supervisor is required to report actual work hours by work order number With which statuses
can this be
accomplished? {Choose two.)
A. CANCEL
B. PNDREV
C. INPRG
D. WAPPR
E. COMPLETE
Answer: C,D

C2010-555 的中率   

JapanCertは最新の070-345問題集と高品質のHPE6-A07問題と回答を提供します。JapanCertのC_THR86_1702 VCEテストエンジンと1Z1-327試験ガイドはあなたが一回で試験に合格するのを助けることができます。高品質の70-480 PDFトレーニング教材は、あなたがより迅速かつ簡単に試験に合格することを100%保証します。試験に合格して認証資格を取るのはそのような簡単なことです。

記事のリンク:http://www.japancert.com/C2010-555.html